WIP Wednesday

Wednesday, April 17, 2024

As Mister Rogers would say, “It’s a beautiful day in the neighborhood!” We woke up to lots of sunshine and even got to have coffee on the porch until the breeze picked up – the breeze off the water is still pretty cold.

I thought I would update you on my knits, my WIP Wednesday post, so to speak. As I type, my Braided Cable Handle Tote is in its second very hot wash cycle. The first cycle was pretty close to felted but I could still see stitch definition so I’ve put it back in for round two. I didn’t think I’d want to have a pink purse but the yarn was a gift and the pattern was free so … off I went on Eclipse Day 2024 with a new project to cast on. It’s a simple enough pattern to knit and the cables add some interest to the stockinette stitch in the round. If I had the ability to be regimented and to keep track of my hours knitting, I’d know how long it took me to knit. BUT I don’t have that gene so I’m going to guess it took about 8-10 hours to knit? That would mean if I was going to even think about selling these and paying myself a “fair” wage (Maine minimum wage is close to $15/hour) I’d have to charge, for my time, $120-150 for this bag. Because this was gifted to me, the cost of materials is 0 but normally, two balls of 100% wool yarn would be somewhere in the area of $20-25. So, when I add the cost of materials to my time the bag now becomes $140-175. AND if I wanted to line it with fabric, that cost goes up again. I don’t know about you, but I don’t think I’d be willing to pay that for a felted bag … I’d love to hear what you think. But my feeling is that I won’t be knitting a bunch of these for a craft show any time soon.

I’ve also been working toward completion of my Oorik Tank Top. Last night I completed the first of the two arm hole ribbing. It was a tight circle to knit with my 5″ needle tips but I did it and began to weave in all the ends on the inside of the vest. I am totally patting myself on the back for the knitting on this vest. It looks pretty stinking great! Today I haven’t decided which project will get my attention first but this Oorik tank is one possibility. It’s so close!

I worked a bit on my raspberry-colored socks, too, yesterday. I’ve gotten to the end of the second sock and have a few more rounds before I can graft the toe and say that these are done. I really love the color of the socks and I really hope the person that I made them for loves them and wears them. Often when you gift someone something they don’t wear them OR they don’t care for them. I’m giving up that bit of “control” and hope that they’ll be cared for and worn … that’s the best I can do. Next on the needles for socks will be some self-patterning yarn that I’ve been hauling around with me forever. I think I may make one of the Crazy Sock Lady’s patterns. The yarn is a cotton blend and pink and white … I’m noticing a pattern here. Haha.

I have begun the first thumb on my Fiddlehead Mittens but they’ve not been touched for a while. This should only take me a few hours to finish and then the mittens need a knitted lining … I haven’t knitted a lot of mitten linings but the ones that I have knit are not perfect and I hope that my “practice” on the last couple of linings will make this lining the best one yet. I still haven’t decided what yarn I will use to line the Fiddlehead Mittens but I will use yarn from my stash. And I am reminded that the Maine Yarn Cruise will happen again this year with some big changes, apparently. There will be an online component (I think the passport will be virtual or print-your-own) and I know my LYS, Yardgoods Center, will be participating. It runs from July 1 through Indigenous Peoples Day in October. There’s a website!

I pulled out the bottom ribbing and a couple of inches of my Sunset Highway sweater at least a couple of weeks ago and it’s been sitting on my ottoman for all that time on a stitch holder. I have to try it on to see if I’ve frogged it back enough (and I haven’t tried it on yet) and then re-knit the ribbing. I’ve also got to work the kinks out of the leftover yarn so that I can reuse it which means spraying it with water and stretching it on my swift or washing it and letting it dry on my swift. Update: I just tried it on and I think it needs to be frogged back another couple of inches so that it will be about this length when I reknit the ribbing. Or a little bit shorter. I have to check out the pattern since I finished this sweater so long ago to see how many inches of ribbing it asks for (and see if I agree.) Once the body is finished, I may have to do something with the sleeves, too. I’m not sure I like the heaviness of the dark red at the “cuff”. Hey, a pattern is only a guideline, right?

I still have a few things that are still on my list of things that need to be finished and I’ve had an “order” for another Emotional Support Chicken and for another Ruby the Mega Ray. I had an interesting experience shopping online with Michaels … I ordered safety eyes for the chickens and yarn for three rays … I was sent one set of eyes and got an email that part of my order was being sent (another set of eyes and half of the yarn.) I also got an email that my order was cancelled because the yarn was out of stock … but it’s still listed for sale on the website. So … when I called Michaels to ask if I had more stuff coming, the customer service rep was nice enough with a little snark and I may have to return all the yarn because I have nothing for the underside of the rays … unless I want to start over again and try to order a different belly color. AND then I have to wait again to see if I get any of the yarn I order … to be determined.

I had begun another sweater wayyyyy back when and then it has sat idly by while I did other things. I do want to make this sweater if I can figure out where I left off and can pick it up again and my stitches are consistent after all this time. I may begin again … the sweater is the Tree Seasons Cardigan and I absolutely fell in love with the yarn used in the pattern and I was able to buy ten balls which is exactly what I need to complete the sweater. I hope I can lengthen it a bit but I don’t want to run out of yarn either. I have a long way to go until I figure that out. This is a heavily cabled cardigan and it will be my project that requires me to sit by myself in a quite room project. At least initially while I learn the pattern. I want to get it done so I can wear it in the fall which means that I’m going to have to pull it out soon.

I want to start Susan B. Anderson’s bunny rabbit with a sweater pattern. Yarn is in a project bag in my studio waiting for me to finish just a few of my WIPs so that I don’t feel too guilty starting something new. Ha!

Gone knitting.

It’s been a “Timespan”

This has been a crazy busy timespan … since I am lazy enough to not go back and see when I last posted, I’m using that word to indicate that it’s been a while since I have last written something here.

Life has taken on a life of its own and I am feeling the pressure of fall and shorter darker days and the impending holidays that always add pressure. Maybe one of these days I’ll learn to say “no” more often but for now, I am keeping my promises and working hard to stop every so often so that I don’t fall apart. Spending part of every day with yarn in my hands certainly helps. It also helps me to see that I am making progress both in my knitting projects and in work and volunteer areas of my life. My husband and I even had a date night and went to see a movie – neither one of us “liked” it but we went out. Together! A first since the pandemic began.

Socktober Socks

I started a thing at the store that isn’t original and not close to being my idea. Socktober. I found an article somewhere on the Internet about it and did a bit of research and then added it to my work newsletter that I write each Sunday morning. The Yardgoods Center – Yarn department – donated 16 pairs of hand knitted socks to the Mid-Maine Homeless Shelter. I knit the pair above and also included a pair of baby pink hand knit socks, two pairs of store-bought socks that have been in my gift drawer (doesn’t everyone have one of these?) and the wonderful customers at YGC brought in the rest. I think it’s a wonderful gift to those who are less fortunate and I hope the socks will keeps some feet warm this winter.

Pattern: Yankee Knitter Socks for the Family, Yarn: Regia 8 Fadig. Check my Ravelry project page for more details on this project and all of the others I talk about. I’m LindaR on Ravelry.

I have a bunch of projects on the needles and a few that I feel like I need to get to or need to finish.

Neck-Down Pullover for Men

I have finally made some real progress on my husband’s Christmas sweater. I gave him the yarn for said sweater last year at Christmas and it looks as if I will have it finished by Christmas this year. I’m knitting him the Knitting Pure and Simple Men’s Pullover in Cascade 220 yarn in a heathery-gray colorway. I don’t recall ever knitting with Cascade 220 yarn and I really like the hand of this 100% wool yarn. It’s not scratchy at all.

Pattern: #991 Neck-Down Pullover for Men, Yarn: Cascade 220 (100% wool).

Evergreen Socks

I finished my “Christmas Tree” socks that I’ve been wanting to knit for ages. I’m trying to keep up with a pair of socks a month (2021 Sock of the Month Challenge) and I may have fallen off the wagon just a bit but I think I am back on. This pattern is on Ravelry and I used deeply stashed yarn by the Buffalo Wool Company. Back when I was being paid to work full time (as compared to now when I’m working part-time and volunteering part-time) I joined a yarn club with BWC. I got to know the owner because we had a couple of shipping snaffus … mostly because we were in Maine for a couple of months and then Florida the balance of the time and yarn went to one place when we were in another and never the twain should meet. Ron was an absolute wonder to work with and when I “tripped” over him at an outside holiday art/craft festival in Washington, DC one year, it was really fun to be able to meet in person. (And of course he remembered me as the shipping problem. LOL)

Pattern: Evergreen Socks, Yarn: Buffalo Wool Company Tracks Sock

Arne & Carlos 2021 Advent Calendar

I’ve begun working on Arne and Carlos’ 2021 Advent Calendar patterns. I adore these little “jumpers” so much and they’re fun to knit and very satisfying to finish in a day or two. I’ve finished the first two jumpers and have finished knitting the third but still need to weave in ends and steam block it. I don’t imagine that I’ll finish these before Christmas is over but I will get them done (probably before I finish the Christmas balls from 2020) because I really want to have them displayed in the house. It takes me about four hours to knit one of these and another half an hour to do the finishing. Each one is unique and there is a collection of Christmas balls to match … I won’t be buying that pattern … yet.

Pattern: Arne and Carlos 2021 Advent calendar mini-jumpers is available for purchase on their website, yarn: Patagonia Organic Merino by Juniper Moon Farm.

I have been crocheting snowflakes for the store window display using free patterns off the internet and scraps of yarn on hand. I have to get the glue out and dilute it to “starch” them so that they’ll hang straight. I’ve also been crocheting a set of Yip Yips that will be a gift. I’ll stop talking about them here and will write about them after they’re delivered. Another gift is a pair of socks that are on my needles currently. It’s a pair of “vanilla” socks in a colorful colorway and I’ll write more about them later, too. Suffice it to say that I am almost done with the first sock. I’ve got a way to go to get them completed.

My FEZA baby blanket is nearly finished. I’ve reached the finishing point of the fourth color. Since this isn’t promised to anybody (I started it as a project to work on when I am teaching classes or sitting in a Zoom meeting) it is sitting alone in the bottom of my knitting bag. I’ll get it finished one of these days. My Fine Sand Cardigan is in the same place. I won’t likely wear it until spring. That gives me the winter to get it finished. I really need to get it finished THIS winter, though.

With any luck, the next time I write here, there will be more than one finished item. Perhaps a sweater and a blanket by the end of the year? I’m keeping track this year of how many projects I complete … so far it’s up to around 50. Can I reach 60? Time will tell … that work thing keeps getting in the way of my knitting time.

Gone knitting!